Solar Window Films

Solar control film is the cheapest energy retrofit in the building — no new glass, no construction, no scaffolding, and it's finished in weeks rather than quarters.

A restored retail frontage after tagged film was stripped and replaced.

Solar Control Films

The Retrofit
That Pays For Itself

Replacing curtain wall glazing with high-performance units is a construction project with a construction budget and a schedule measured in quarters. Solar film delivers a large share of the same performance for a fraction of the cost, installed from the interior, overnight, with no permits and no scaffolding.

The older office stock along Brand is a strong candidate precisely because its glazing performs poorly. Film improves on what the glass already does, so the available benefit is whatever performance hasn't been captured — and on early tinted or single-pane curtain wall, most of it is still on the table. We model the options against your actual glazing and hand you the solar heat gain numbers before you commit.

  • Up to 80% infrared heat rejection
  • 99% UV blocked
  • Spectrally selective, ceramic and reflective options
  • Solar heat gain coefficient modeling
  • Title 24 compliance documentation
  • Utility rebate paperwork support
Free Quote

What Sets Us Apart

Why Businesses Choose
Window Films of Glendale

Targeted Rejection

Spectrally selective products remove the infrared and leave the daylight, and the canyon view, alone.

Weeks, Not Quarters

Re-glazing a tower runs over several quarters. Filming a whole elevation is measured in nights.

Greener Building

A lighter load on the plant cuts consumption, and no serviceable pane leaves the building.

Documented Performance

Solar heat gain, light transmission, and infrared numbers from the maker, ready to pass to ownership.

Our Process

How It Works

01

Energy Assessment

We log the glass, its aspect, and how it performs now, then name the elevation worth doing first.

02

Model The Options

Two or three products compared straight across on performance, daylight, appearance, and cost.

03

Install

Applied from inside the envelope — no swing stage, no permit, no pause in the building's operation.

04

Verify & Document

A closing inspection, the documentation pack, and help with any rebate or Title 24 filing.

Ready When You Are

Get Your Free Quote Today

Assessments cost nothing, break down by opening, and come with a straight view on which glass genuinely warrants treating. In most buildings that turns out to be one or two elevations rather than the lot.

Send the details through and we'll respond inside one working day.

Get Your Free Quote

Every quote is free and no-obligation. Tell us about your glass and we'll get back to you within one business day.

Get a Free Quote